Worksite A

Worksite B

Worksite C

1) Staff (supervision)

Interns/Foreman/Workers

01/01/-

04/01/05

01/01/-

Engineers

01

01

01

2) Types of companies

Residential

Residential

Residential

3) Pattern of companies

Popular

High

Medium

4) Type of design

Singular

Singular

Pattern

5) Forecast of work duration

27 months

49 months

50 months

6) Technical data

Number of slabs

08

32

22

Total height of the building (m)

29.40

97.00

60.00

Floor height (m)

3.00

2.95

2.71

7) Typologies

Structure

Reticulated with ribbed slab and edge beams

Reticulated with solid slab and edge beams

Sealing (block)

Concrete

Ceramic

Ceramic

Internal coating

Mortar/Texture

Ceramic

Ceramic

External coating

Plaster, painting and ceramic

Single mass and ceramic

Single mass and ceramic