Horizontal axis label

Excluded/Included metrics

1

All metrics were included in the training process

2

Fixation rate was excluded from the training process

3

Fixation duration was excluded from the training process

4

Fixation count was excluded from the training process

5

Average saccade length was excluded from the training process