| A | Cycle 1 Projects | Cycle 2 Construction | Cycle 3 Operation | Cycle 4 Closure |
| A1. Geological research | 1 | 0 | 0 | 0 |
| A2. Urbanization overload | 1 | 0 | 0 | 0 |
| A3. Recreational beach facilities | 0.84 | 0 | 0 | 0 |
| A4. Overload of people | 0.84 | 0.97 | 0 | 0 |
| A5. Air pollution | 0 | 1 | 0 | 0 |
| A6. Liquid waste pollution | 0 | 1 | 0 | 0 |
| A7. Solid waste pollution | 0 | 1 | 0 | 0 |
| A8. Earthworks | 0 | 1 | 0 | 0 |
| A9. Transportation of materials | 0 | 1 | 0 | 0 |
| A10. Prefabricated assembly | 0 | 1 | 0 | 0 |
| A11. Natural landscape construction | 0 | 1 | 0 | 0 |
| A12. Exotic green area | 0 | 1 | 0 | 0 |
| A13. Paving of roads | 0 | 0.79 | 0 | 0 |
| A14. Dumping of waste | 0 | 1 | 1 | 0 |
| A15. Excessive vehicle traffic | 0 | 0.84 | 0.72 | 0 |
| A16. Beach facilities | 0 | 0 | 0.76 | 0 |
| A17. Power plant | 0 | 0 | 1 | 0 |
| A18. Temporary facilities | 0 | 0 | 0.78 | 0.84 |
| A19. Degradation of landscapes | 0 | 0 | 1 | 1 |
| A20. Dumping sand beach | 0 | 0 | 0.72 | 0.72 |
| A21. Abandoned quarry | 0 | 0 | 0 | 1 |