Name of the facility

Parameters of uniform distributions (A ± B)

Mean(seconds)

Half-width(seconds)

Blanking

1.5

±0

Deburring

1.5

±0

Flattening

7

±0

Grooving

5

±0.2

End-Chamfer

5

±0.2

IDC

9

±1

ODC

10

±1

Grinding

20

±0.2

Vibro-Finishing

15

±1

Flattening

2

±0.2

Washing

2

±0.2

Packing

3.5

±0.5