Plants | Units | Upper Output/MW | Lower Output/MW | Ramping Capacity/(MW/h) | Lower Startup Time/h | Lower Stop Time/h | Coal Consumption Rate | Startup Cost/¥ | Coal Price/(¥/GJ) | ||
a/GJ | b/(GJ/MWh) | c/(GJ/MW2 h) | |||||||||
A | 1 | 100 | 10 | 50 | 4 | 4 | 176.9 | 13.5 | 0.0004 | 100 | 7.7467 |
2 | 200 | 50 | 60 | 2 | 3 | 129.9 | 32.6 | 0.0004 | 300 | 7.7418 | |
3 | 300 | 60 | 30 | 1 | 1 | 137.4 | 17.6 | 0.0004 | 100 | 7.7424 | |
B | 4 | 100 | 20 | 30 | 2 | 2 | 125.8 | 20 | 0.0003 | 200 | 7.7436 |
D | 5 | 120 | 20 | 40 | 1 | 1 | 140.6 | 30 | 0.0006 | 200 | 7.7421 |
6 | 180 | 30 | 50 | 2 | 1 | 145.7 | 40 | 0.0006 | 300 | 7.7436 | |
7 | 200 | 40 | 40 | 1 | 2 | 156.9 | 10 | 0.0006 | 100 | 7.7410 |