No

Dissatisfaction attributes

Percentage of satisfaction and dissatisfaction from the total respondent (152)

Not at all

To some extent

Very much

No.

%

No.

%

No.

%

No.

%

No.

%

1

Poor road construction (badly damaged) in the park during rainy season (March-June) where Tourist (foreign) flow is high

-

-

23

15.13

129

84.87

2

Environmental deterioration, settlement, cattle graze together with wild animals of the NNP, illegal wood product collector and encroachment

-

-

-

-

40

26.3

112

83.7

3

Poor service provided to tourist who enjoy the Night life in the park

-

-

49

32.24

103

67.76

4

Unavailability of electric power and failures

22

14.47

95

62.5

35

23.02

5

Lines and waits for service

50

32.89

70

46.05

32

21.06

6

No public toilets

-

-

99

65.13

53

34.87

7

Trouble changing money

44

28.94

108

71.06

-