Soil Management | Symbol | Description | |
Traditional Preparation | PRT | Three harrowings using a plowing harrow and two more with a leveling harrow, with the operations carried out before planting in the harvest, once a year. In the off-season, direct sowing was carried out, with no soil preparation being carried out, due to the rainy season in the region, which made soil preparation at that time impossible. | |
Direct Planting System | SPD | Soil preparation before system implementation. Afterwards, there was no soil preparation, with the only disturbance being in the sowing line during the harvest and off-season. | |