Sl. No | Internal Activities | External Activities |
1 | Placement of machine | Pre-planning arranging machine |
2 | Arranging manpower | Pre-planning arranging manpower |
Critical operation and operator analysis | ||
3 | Machine tool arranging | Feeding machine toolbox beforehand |
Previous style layout analysis | ||
New style layout analysis | ||
Consult with the selected operator | ||
4 | No attachment in an extra machine | Attachment in extra machine beforehand |