Description of phases

Emissions of CO2-eq (g/kWh)

LFO Power Plant

HFO Power Plant

Gaz Power Plant

Fuel Cycle

Exploration

4.48

4.60

3.83

Production

9.80

56.99

47.46

Transport

0.99

5.74

4.78

Plant construction

Raw material of construction

0.0067

0.039

0.032

Establishment of the power plant

0.058

0.34

0.28

Plant equipment

0.043

0.25

0.21

Operation of the plant

Maintenance

5.53

32.14

26.77

Combustion

851.84

843.82

493.27

Dismantling of the plant

Dismantling

0.0037

0.022

0.018

Recycling of the site

0.0007

0.004

0.003

Total

872.74

943.94

576.65