Description of phases | Embodied energy (105 GJ/kWhe) | |||
LFO Power Plant | HFO Power Plant | Gaz Power Plant | ||
Fuel Cycle | Exploration | 5.75 | 5.91 | 4.92 |
Production | 12.57 | 73.13 | 60.90 | |
Transport | 1.27 | 7.36 | 6.13 | |
Plant construction | Raw material of construction | 0.01 | 0.04 | 0..3 |
Establishment of the power plant | 0.07 | 0.43 | 0.36 | |
Plant equipment | 0.05 | 0.27 | 0.22 | |
Operation of the plant | Maintenance | 7.09 | 41.25 | 34.35 |
Combustion | 1093.15 | 1082.87 | 859.24 | |
Dismantling of the plant | Dismantling | 0.005 | 0.028 | 0.023 |
Recycling of the site | 0.001 | 0.005 | 0.004 | |
Total direct energy | 1093.15 | 1082.87 | 859.27 | |
Total indirect energy | 26.82 | 128.42 | 106.94 | |
Total | 1119.97 | 1211.29 | 966.18 |